Manual action instance after a precondition
kec Mar 28, 2012 3:58 AMMorning all.
Apologies if I seem to be starting a lot of discussions lately but we are getting pushed to get our last few defects fixed asap.
We have a 'Release Management' Process which wasn't working as the precondition test was incorrect - I've fixed this.
However, looking at the process as designed by LANDesk, I'm not sure if this design should actually work correctly.
Can you please take a look at the 2 preconditions that are followed by manual actions (diagram attached).
Are the 2 manual (windowless) actions 'Return to Release Being Scoped' a valid method to 'Move on' to another status within a process?
Many thanks,
Keiron.
-
process_problem.JPG 30.9 K